Distributed Generation

Distributed Generation

Wind Turbine

Distributed generation, or DG, are small-scale renewable energy systems to produce electricity on your property. If you have not already purchased a system and are interested in installing a solar system on your own property, please visit www.IowaChoiceRenewables.com.

The Cooperative's Responsibilities

A written agreement between the cooperative and the member-consumer is developed to ensure proper communication and protections are in place prior to connection of the facility to the grid. Consideration must also be given to established requirements for installation, maintenance, metering, switching and liability insurance. 

The Member-Consumer's Responsibilities

The general requirements for a member-consumer to install and interconnect wind or solar generation include paying for any interconnection devices that are necessary to protect the safety of the cooperative representatives and to maintain the integrity of the delivery system. The member-consumer is also expected to carry liability insurance. Individuals must also pay for the necessary metering equipment used to measure kilowatt-hours (kWhs) delivered back to the grid by the member-consumer.

Note: With the passage of House File 2301 by the Iowa Legislature, member-owners installing renewable energy systems must provide notice to their cooperative utilities in writing 30 days before the generators are installed.

Safety hazards result if member-owners install alternative generating sources, such as solar panels or small wind turbines, without notifying the cooperative of that installation. Should there be a power outage requiring work on cooperative electric lines, linemen may be unaware of the additional connected generation and think the line is dead. Linemen could be injured by power feeding back onto the line from the member-owner's alternative energy sources.

When contacted about new alternative generation that will be installed, the cooperative will advise member-owners about devices needed at the interconnection point that will keep power from flowing back onto the grid in maintenance or emergency situations.

Resources

1). The Iowa Energy Center, who's mission includes "providing Iowans with reliable, objective information on energy and efficiency options," created a helpful publications called the Solar PV Energy Guide. Please review it as well as the information and resources they have available at www.iowaenergycenter.org.

2). The Iowa Utilities Board has developed an Informational Guide for On-Site Generation (Distributed Generation) to help consumers who are considering the installation of electric generation on their property.

3). In an effort to better serve our Members, Midland Power has partnered with other cooperatives in Iowa to form Iowa Choice Renewables, LLC. Iowa Choice Renewables is your go-to source for renewable energy information. Check out Iowa Choice Renewables' website to learn more about what options may best suit your needs. 

Interconnecting with Midland Power Cooperative

For more information on distributed generation, please refer to Midland Power Cooperative's Cogeneration and Small Power Production Tariff.

For more information on payments for excess power you might generate, please refer to 2017 Information for Co-Generators.

To apply for interconnection with a 10kVA or smaller facility (located anywhere in Midland Power's service territory), please use this Level 1 application form.

To apply for interconnection with a system larger than 10kVA please use the information below to select the correct application form, based on the location of the qualifying facility. 

Midland Power's G&T Territory Map

Please use Midland Power's Corn Belt territory Level 2 - 4 application form for members in the map's blue area: (additional forms will be provided separately)

Grundy County; Hamilton County Townships of Independence, Liberty, Lincoln, Lyon, Rose Grove, Scott & Williams; Hardin County; Humboldt County; Kossuth County; Marshall County; Pocahontas County; Story County Townships of Howard, Lincoln, Milford, Richland, Sherman & Warren; Wright County


Please use Midland Power's CIPCO territory Level 2 - 4 application form for members in map's orange area:

Boone County; Calhoun County; Dallas County; Greene County; Guthrie County; Hamilton County Townships of Marion or Webster; Polk County; Story County Townships of Franklin, Palestine & Washington; Webster County


For members in the grey area of the map, please contact Midland Power at (800) 833-8876 with the service address to find out which Level 2 - 4 application form needs to be completed. This is for the following locations: Hamilton County Townships of Clear Lake; Ellsworth; or Hamilton; and the Story County Township of Lafayette.  

Additional questions?
Contact Midland Power at (800) 833-8876.